Safety compliance and pre-demolition documentation are non-negotiable. Capture hazard surveys, structural conditions and daily progress — automatically via WhatsApp, with zero extra steps.

Missed inspections and undocumented hazards create serious liability. Without a systematic record of every safety check, you're exposed before work even begins.
Without systematic before-state photos, disputes about existing damage arise. Neighbours, owners and engineers all need proof of what was there before you touched it.
Clients and engineers need evidence of what was demolished each day. Manual photo uploads and written logs slow your crew down without adding any real accuracy.
Link your demolition site's WhatsApp group to Banamind in minutes. Your crew keeps using the app they already have — nothing changes for them on site.
Operatives photograph hazards, structural conditions and pre-demolition states directly in WhatsApp. Every image is timestamped and geotagged automatically.
Banamind classifies every photo by site zone, demolition phase and hazard category. No manual sorting — the record builds itself as work progresses.
End-of-day reports are assembled automatically from captured photos and notes. Share them with engineers, clients or the principal contractor in one click.
When the project completes, generate a full clearance certificate with photo evidence, zone-by-zone sign-off and compliance records — ready for handover immediately.
Platform Features
Document hazard surveys, track demolition phases and generate safety reports — without slowing down your crews.
WhatsApp & email capture
Every photo, video, voice note, and document from WhatsApp and email is saved and AI-tagged by project, stage, zone, and work type. One tap to confirm.
AI progress tracking
AI tracks construction progress from your updates. Evidence auto-links to progress %, see planned vs actual, get deadline reminders.
Progress reports
Generate reports with AI summaries, photos, checklist progress, and documents. Edit, export to PDF, or share via a revocable secure link.
Risk management
AI monitors for delays, budget overruns, missing materials, and compliance gaps. Risks scored by severity with mitigation suggestions and weekly summaries.
Steel delivery delayed by 2 weeks due to port congestion.
Concrete costs increased by 8% this quarter.
Heavy rain predicted next week may halt exterior work.
AI project assistant
An AI agent that generates invoices and reports, builds project plans from a voice note, searches all files, inspects every photo for defects, collects missing data from your team via WhatsApp, and answers any question — with sources.
Banamind AI
Project assistant
What's the status of Zone B?
Zone B is 78% complete. Electrical rough-in finished yesterday. Plumbing inspection scheduled for Thursday.
Create a progress report for Phase 2
Report generated
Phase 2 Progress Report — 12 tasks, 24 photos, 3 documents attached
Invoicing
Create invoices, attach progress reports, and send with payment links.
Compliance
Country-specific checklists, missing doc alerts, and compliance reports.
Project feed
Photos, videos, voice notes, and documents — all in a real-time feed organized by project.
Project timeline
Visual timeline with milestones, delays, and phase dependencies.
Document intelligence
OCR, field extraction, content search, and AI summaries for all docs.
Share updates
Share progress with clients via secure links. They approve, comment, or request changes.
AI inspection
Defect detection, evidence validation, and risk flags — before you sign off.